INSTALLATION:
- When installing ensure grates are in U Channel base to prevent inward flexing of U Channel base
- Correct directional fall and flow to drainage points is essential
- Water flow capacity -subject to application and pipe sizes removing water.
- Refer local specifications and conditions to apply.
- Drain Grates or water catchment to be located at low point to avoid water cross over-see diagram
- Connect pipes to end cap or pipe holes may also be cut into side or bottom of channel
- To avoid movement of U Channel when installing. Place U channel base in concrete prior to completion of paved surface. Lengths are joined by pushing the ends together which connect firmly





